Micro Planner X-Pert

X-Pert is designed to deliver the power and flexibility demanded by managers responsible for the integration of multiple projects within an overall corporate environment or the delivery of a single major project. Project data can be easily merged or imported from other X-Pert files as well as from other Micro Planner systems and Microsoft Project (MPX). X-Pert’s power is delivered via a user friendly graphical interface with default settings for all key functions. This allows each user to work with only those areas of the system needed to optimise control over their project, minimising the learning curve. As skills develop or project requirements change, additional features can be brought into play to maintain full control, enhance reporting and optimise outcomes.

Click here for the technical specifications

Transmitters & Receivers
Dynamically link projects to projects, which may be separated by geographic location (WANs, LANs) without the need (or cost) of SQL databases within X-Pert to allow current status information to be transferred in real time across networks and the creation of integrated “super” projects of almost unlimited size.

Flexible Time Units and Calendars
X-Pert’s default settings provide the basic framework for most projects. However, advanced users may choose to work with any combination of weeks, days, shifts, hours, and/or minutes (eg 3 days, 2 hrs & 15 min) and have full control over the length of each working week, working day and shift to accurately model their working environment. Up to 200 different calendars can be created and allocated separately to tasks, resources and dependencies for complete management control and enhanced accuracy during time and resource analysis.

Merge
Allows complete blocks of project data to be copied, cloned and moved between different X-Pert projects as well as to and from project files created in the smaller Micro Planner Manager.

Standard & Custom Reports
X-Pert’s standard reports can be edited to adjust the time scale used, select & sort (filter) information and show (or hide) float, resources, etc. Standard reports include, Logic Networks (PERT Chart), Gantt Charts, Logic Linked (Time Scaled) Gantt Charts, Tables, Task Listings, Progress reports, “S-Curves”, Pie Charts, Histograms, WBS and Cost Reports. Customised reports may be adapted from existing standard reports or created from scratch. The WYSIWYG report designer allows the addition of logos and addresses as well as editing the X-Pert data fields displayed, fonts used, etc. All customised reports can be saved to the Hard Drive for future use with other project files.

Micro Planner X-Pert v3.5.1. Expand Capacities & Features:

The amount of information that can be entered in a project has greatly expanded. These are the new capabilities:

Max. No Operations per project went from: 10,000 to 15,000
Max. No Subprojects per project went from: 50 to 100
Max. No Operations per sub-project: 1,364
Max. No Resources rose from: 250 to 500 per project 20 per operation
Max. No Work Breakdown Elements rose from: 1,000 to 1,500
Max. No Calendars per project rose from: 250 (up to 89 year time span) to 500
Flexible Time Units: Weeks, Days, Shifts, Hours, Minutes
Number of Zones went from: Zone Label (16 character) 250 to 500
Number of Responsibilities Label (16 character) rose from: 250 to 500
Number of Cost Label (16 character) rose from: 250 to 500
Sort Code (8 character): Full positional select / sort
Link Types: Finish-to-Start, Start-to-Start, Finish-to-Finish & Start-to-Finish
Import/Export file formats: TEXT, DIF, CSV, XML & MPX (Import only)

Hardware Requirements:

Recommended minimum:
Windows 95/98/Me/2000/XP/Vista/W7
20Mb Hard Disk Space, 64Mb RAM, 1024 x 768 Video.